Monday, 10 June 2019

NEXT-GEN Nescot Year 2 - Synoptic Project - Risk assessment

During year 2 we were tasked with creating a risk assessment based on the animation industry hazards and risks. It also could include how to use control measures to lower their risks.

My risk assessment is shown bellow.


I believe I did well on my risk assessment because of the different forms of hazards and their control methods. Despite this, I believe that I could have improved the risk assessment more if I had structured the level of risk more effectively and if I added more hazards or potential risks.

Bellow is an example of the industry standard of risk assessments in the animation industry.


BBC academy how to do a risk assessment "http://www.bbc.co.uk/guides/zg6xk2p"

No comments:

Post a Comment

NEXT-GEN Nescot Year 4 HND - Going Indie (Final game, itch.io Link)

For the final part of my Game Development project (Topdown Shooter), I was required to upload my finished game to Itch.io, allowing my game ...